Friday, October 1, 2010

Building Finish List

At the CORE gathering on Sunday, there was a lot of interest in our building and how we had prioritized what was left to be done. Here is a list of the priorities. There are many things that we would like to do that are not on this list, but this is the 'short list'.

  • Complete Septic System.
  • Additional 80 gravel parking spaces installed on-site.
  • Student Trailer handicapped ramp, siding, foundating skirting and sidewalk so that we can get a CO on it and start using it.
  • Sound and lighting systems completed.
  • Repair lower parking lot.
  • Landscaping.
  • Cove Base (trim at the bottom of the sheetrock).
  • Concrete Apron and handicapped sidewalk.
  • Snow Diverters for roof.
  • Wood trim finished in office suite.
  • Welcome table finished/coffee table constructed to match.
As we discussed the other night, we also would benefit from paving the rest of the parking lot. It would add a lot to have a playground and a grand piano (yes, I'm serious).

The bottom line is that we have to work with the funds we have, and we have to pay our bills along the way. I know that everyone does not get excited about these details, but there seemed to be a lot of interest, so I hope this sparks some ideas. Thanks for being so faithful to PCC!